Campus development project

In July (2018) we received the building permit, and on 6 August the construction of the new building began. To keep up with the progress of work, to see photos and video on the site we provide the following links: FACEBOOK, INSTAGRAMTHE PHOTO GALLERY OF OUR SITE AND YOUTUBE CHANNEL.


Due to institutional growth, ITPB is in need of improved educational facilities. The construction of a new building, of 6000 Sq m, is planned to begin soon. This facility will include 12 classrooms, one auditorium, a media lab, a 350 seats chapel, 2 conference rooms, space for socialising, library and offices.
In addition to the above, the current facilities will be thoroughly modernised. A new level will be built on top of the current educational facility, which will become a hostel for professors. Three new levels will also be built over the current cafeteria and another level over the current student dorm. These will resolve the crisis of space for hosting students ITPB is currently facing. The final surface of the campus will be 11,500 Sq m.

 

×